MySE 11-12MW Offshore Wind Turbine
(设备/材料)
描述:
The MySE 11-12MW offshore wind turbine is intended for large-scale offshore renewable energy projects. The turbine platform uses a large-diameter rotor design for increased annual energy production. It integrates smart monitoring and offshore operational support systems. The model is designed for fixed-bottom offshore wind farms.
概观:
Ultra-compact Hybrid Drive: 97% drivetrain efficiency
Robust typhoon resistance, withstands up to 78 m/s winds
Smart hydraulic lubrication and cooling system for efficient O&M
Rated Power: 11 MW
Rotor Diameter: 233 m
Swept Area: 42,636 m²
Application: Offshore wind farms
Control System: Smart turbine management
Mingyang Smart Energy Group Co., Ltd.
市场: China Three Gorges, SPIC, CGN, China Huaneng, Datang Corporation, Guangdong Energy Group
员工总数: 13000
地点: 528437, China, Guangdong Province, Zhongshan, Torch Development Zone, No. 22 Torch Avenue, 201210, China, Shanghai, Pudong New Area, Mingyang Industrial Center, 518000, China, Shenzhen, Nanshan District, Offshore Engineering Office
主要产品/服务: Offshore wind turbines; Onshore wind turbines; Floating wind turbines; Hybrid renewable systems; Energy storage systems; Smart energy management; Wind farm EPC; O&M services; Offshore engineering; Hydrogen integration solutions; Digital monitoring systems
注册: 528437, China, Guangdong Province, Zhongshan, Torch Development Zone, No. 22 Torch Avenue
成立年: 2006
