MySE 11-12MW Offshore Wind Turbine
(Оборудование / Материал)
Модель: MySE 11-12MW
Условие: Новый
Сделано в: Китай
Страна Местонахождения или Хранения: Китай
Инженерное сопровождение: Да
Гарантия: Нет
Цена: Звоните
Описание:
The MySE 11-12MW offshore wind turbine is intended for large-scale offshore renewable energy projects. The turbine platform uses a large-diameter rotor design for increased annual energy production. It integrates smart monitoring and offshore operational support systems. The model is designed for fixed-bottom offshore wind farms.
Обзор:
Ultra-compact Hybrid Drive: 97% drivetrain efficiency
Robust typhoon resistance, withstands up to 78 m/s winds
Smart hydraulic lubrication and cooling system for efficient O&M
Rated Power: 11 MW
Rotor Diameter: 233 m
Swept Area: 42,636 m²
Application: Offshore wind farms
Control System: Smart turbine management
Mingyang Smart Energy Group Co., Ltd.
Основные рынки: China Three Gorges, SPIC, CGN, China Huaneng, Datang Corporation, Guangdong Energy Group
Количество сотрудников: 13000
Местонахождение: 528437, China, Guangdong Province, Zhongshan, Torch Development Zone, No. 22 Torch Avenue, 201210, China, Shanghai, Pudong New Area, Mingyang Industrial Center, 518000, China, Shenzhen, Nanshan District, Offshore Engineering Office
Основные продукты/сервисы: Offshore wind turbines; Onshore wind turbines; Floating wind turbines; Hybrid renewable systems; Energy storage systems; Smart energy management; Wind farm EPC; O&M services; Offshore engineering; Hydrogen integration solutions; Digital monitoring systems
Регистрация: 528437, China, Guangdong Province, Zhongshan, Torch Development Zone, No. 22 Torch Avenue
Год основания: 2006
