×
COILED TUBING
(Service)
Description:
Estrella International has Coiled Tubing and operations with Nitrogen for fluid displacement services through pipelines, remedial and abandonment cementing, gas line integrity testing, well induction with nitrogen, inerting or purging of systems, drill steam test, sand cleaning, stimulation, commingled, leak test, among others.
Overview:
Coiled Tubing Units
CTR‑101
| Parameter | Value |
|---|---|
| Engine | Detroit 6V92 |
| Hydraulic Pump | Sauer Danfoss |
| Coil Tubing Reel Capacity | 1.75″ – 18,000 ft |
| Injector Manufacturer | JEREH |
| Pull Capacity | 80,000 lb |
| Snub Capacity | 40,000 lb |
| Max Speed | 200 ft/min |
| Min Speed | 0.5 ft/min |
| Tubing OD | 1.75″ |
| Min / Max / Nominal Wall Thickness | 0.134″ / 0.204″ / 0.156″ |
| Coiled Tubing Length | 16,200 ft (tapered string) |
| Yield Strength | 90,000 psi |
| Stack Up (BOP / Stripper) | 3‑1/16″ 10,000 psi |
CTR‑102 (New)
| Parameter | Value |
|---|---|
| Engine | Detroit 6V92 |
| Hydraulic Pump | Sauer Danfoss |
| Coil Tubing Reel Capacity | 1.5″ – 22,000 ft |
| Injector Manufacturer | Stewart & Stevenson Series 800L |
| Pull Capacity | 40,000 lb |
| Snub Capacity | 23,000 lb |
| Max Speed | 180 ft/min |
| Min Speed | 0.5 ft/min |
| Tubing OD | 1.5″ |
| Min / Max / Nominal Wall Thickness | 0.125″ / 0.175″ / 0.134″ |
| Coiled Tubing Length | 15,934 ft (tapered string) |
| Yield Strength | 90,000 psi |
| Stack Up | 3‑1/16″ 10,000 psi |
CTR‑103
| Parameter | Value |
|---|---|
| Engine | Cummins KT‑19, 600 HP |
| Hydraulic Pump | Sauer Danfoss |
| Coil Tubing Reel Capacity | 1.75″ – 20,000 ft |
| Injector Manufacturer | Stewart & Stevenson |
| Pull Capacity | 100,000 lb |
| Snub Capacity | 50,000 lb |
| Max Speed | 170 ft/min |
| Min Speed | 0.5 ft/min |
| Tubing OD | 1.75″ |
| Min / Max / Nominal Wall Thickness | 0.125″ / 0.175″ / 0.134″ |
| Coiled Tubing Length | 20,000 ft (tapered string) |
| Yield Strength | 90,000 psi |
| Stack Up | 3‑1/16″ 15,000 psi |
Estrella International Energy Services Ltd.
Main Products/Services: Drilling services, workover services, coiled tubing, cementing, stimulation, directional drilling, slickline, wireline, well testing, project management, and integrated well services
Year Established: 1985
