Add product
Service

Studying the Technical Condition of Wellbores

(Service)
Online Support Service: No
Interpretation of Data: No
Overview:

Casing Cementing Control

The cementing process is controlled by registering the main parameters of the cementing process in wells. Using a set of process sensors and a cementing control station “MEGATAMPONAGE”, the following parameters are measured:

  • supply pressure;
  • density of the injected solution;
  • temperature of the injected solution;
  • solution flow rate;
  • flow rate for injection cycles;
  • total volume of injected solution.

Documentation of the cementation process with the provision of diagram material allows the services of drilling and mining enterprises to carry out a full analysis of the quality of the work performed.

Downhole Acoustic TV

In open trunks by CAT are determined:

  • the intervals of the collapse of the walls of the well,
  • rock cavernosity intervals,
  • single caverns
  • single cracks
  • formation dip angle

In studies in columns, the following tasks are solved:

  • determination of the position and nature of pipe defects (wrinkles, tears, large clearances of coupling joints),
  • the presence, position and nature of perforations.

Casing Cementing Quality Control

Studies on the quality control of cementing casing strings of all diameters are carried out by gamma-gamma cementometry (GHC), electromagnetic defectoscopy and acoustic cementometry (ACC). Well research is carried out using the equipment SGDT-100, TsM, MAK-2, MAK-3, MAK-9, CAT, EMDST.

Tasks to be solved:

  • assessment of the spatial orientation and size of defects (channels, micro-gaps, discontinuities) in the cement ring;
  • determination of the selective and integral density of the annular substance;
  • assessment of casing eccentricity, cement lift, type of cement;
  • study of the distribution of matter in the annulus by density sweep;
  • assessment of the nature of the contact of cement with the column and rock;
  • the study of the technical condition of the column (gaps, cracks, corrosion areas, location of centering lights, etc.).

Electromagnetic defectoscopy, gamma - gamma defectometry and tube profilometry

Tasks to be solved:

  • distribution of the presence, sizes of well support elements (centralizers, couplings, nozzles, turbulators), and their compliance with the design;
  • casing thickness;
  • profiles, minimum and average section of pipes;
  • locations of perforation intervals.

PAO "Permneftegeophysics"

Locations: Moscow / Perm
Main Products/Services: Search and exploration of oil and gas fields, geological and geophysical support of exploration and development of deposits