Add product
Service

Geophysical Services

(Service)
Online Support Service: No
Interpretation of Data: No
Description:
GIRS is carried out by two branches located in Western and Eastern Siberia. The Nefteyugansk branch of 350 people is based in Nefteyugansk. Includes 35 production lots. The main customer is LLC RN-Yuganskneftegaz. Researches are conducted at Priobsky, Pravdinsky, East Pravdinsky, Zapadno-Salymsky, Petelinsky, Malo-Balyksky, Sredne-Balyksky, Yuzhno-Balyksky, Efremovsky, Ugutsky, Kinyaminsky, Fainsky, Mamontovsky, Maisky, Teplovsky, Ombinsky, East-Sibirsky.
Overview:

The Nefteyugansk branch also includes the Buzuluk geophysical expedition, which began its work in late 2016. The expedition, numbering 80 people and based in the city of Buzuluk, has 6 production lots of TACs. Shooting and blasting operations are carried out mainly at the fields of PJSC Orenburgneft in the Orenburg and Samara regions.

The Krasnoyarsk branch of 60 people is based on the Vankor field. AUP is located in the city of Krasnoyarsk. Includes 10 production batches. The main Customer is CJSC Vankorneft and CJSC East Siberian Oil Company. Research is conducted mainly at the Vankor and Yurubcheno-Tokhomsk deposits.

Research is carried out in any climatic conditions using modern equipment. Data transmission is carried out via satellite communication channels, with subsequent operational interpretation and issuance of an opinion.

Types of geophysical research and work performed by JSC “BVT”

  • Posting and exploration of drilled directional and horizontal wells;
  • Study of the wellbore trajectory in the open hole and in the production casing;
  • Assessment of the quality of adhesion of cement to production casing and rock by acoustic cementometry;
  • Quantitative assessment of the filling of the annulus and the thickness of the casing by gamma-cementometry;
  • Scanning acoustic and gamma-cementometry;
  • Assessment of the technical condition of the production casing;
  • The study of injection wells of pressure maintenance while monitoring the development of deposits;
  • Work on the development of wells by swabbing;
  • Assessment of the nature of formation saturation through the column during field development control;
  • Shooting and blasting. Cumulative perforation on cable and tubing;
  • Work to eliminate accidents in wells;
  • Intensification of oil production. The use of powder pressure generators.

Tasks to be Solved

In the open trunk:

  • Lithological and stratigraphic section of a well section;
  • Isolation of reservoirs and determining the nature of saturation;
  • Determination of the spatial position of the wellbore.

After the descent of the column:

  • Studying the technical condition of wells;
  • Control of well cementing technology;
  • Clarification of the location and condition of downhole equipment.

Perforation:

  • Secondary opening of reservoirs;
  • Cumulative perforation.

Under development control:

  • Monitoring the current development of reservoirs;
  • Determination of oil-water contact in productive intervals;
  • Determination of the profile of the inflow of producing and injectivity of injection wells;
  • Identification of annular circulation;
  • Assessment of the condition of production casing.

Well development work:

  • Swabbing;
  • Determination of levels and composition of fluids in wells;
  • Intensification of injectivity and oil recovery.

Interpretation:

  • Geological interpretation of the results of geophysical research;
  • Transmission of geophysical research data via electronic communication channels;
  • Processing and interpretation of materials in the Prime system.

AO "Bašvzryvtehnologii"

Locations: Russia, Samara
Main Products/Services: Geophysical exploration, shooting and blasting
Registration: Russia, Samara
Year Established: 2000