×
名字和姓氏
有效的电子邮件地址。 该地址将用于系统电子邮件和通知。
使用条款
Show terms

By accessing and utilizing our servers, services, websites, or any associated content/postings, you agree (individually and on behalf of a business if applicable) to our Terms of Use (below), which we may update anytime at our discretion. If you do not agree to the Terms of Use (“Terms”), then you are not authorized to use any of our materials for either posting or viewing/search purposes.

More info

17 + 2 =
解答这道简单的数学问题并输入结果。 例如。 对于1 + 3,请输入4。
这个问题被要求找出是否你是一个人或自动发送同样的消息到多个新闻组邮件列表。
添加产品
Product / Equipment

Well Intervention System

(设备/材料)
型号编号: Well Intervention System
状态: New
位置或存放国家: UK
服务工程支持: Yes
保证: No
价钱: 要求价格
概观:

Well Intervention System

An advanced intervention winch system has been developed by Protea for Helix Well Ops UK Limited (Well Ops).

The system comprising five winches, active heave compensators, hydraulic power unit, Nitrogen generator and control equipment was installed as an upgrade package to the existing well intervention tower on the Skandi Constructor.  

The winches are to allow the successful deployment and operation of guide wires and pod lines for well intervention in up to 1500m of water. Precise position control, accurate heave compensation and reliable constant tension systems were key to successfully deploy, attach and maintain these connections to subsea well heads.

Protea Sp. Z o.o.

主要产品/服务: Lifting equipment, cranes, davits, hoists & winches