Technology

Geological and Technological Control (GTI) for cattle and ORS

(技术)
价钱: 要求价格
描述:
The main purpose of applying the technological control complex is to assist the KRS PRS team in carrying out repair work at the well and, directly, to the driller, who, using the information display panel, is able to visually control the technological parameters. Important and up-to-date information is both for the repair team itself and for the technical managers of the enterprise, who are able to identify shortcomings in the work, timely make the necessary adjustments and obtain additional reserves to increase the efficiency of the work performed.
概观:

The use of technological monitoring complex gives the well repair company:

  1. Reducing the cost of repair work in wells.
  2. Prompt decision-making according to technological control.
  3. Documentation of the repair process.
  4. Increasing the efficiency of the work of cattle and CP teams.
  5. Convenience in work of teams of cattle and ORS.

The main functions of the technological control complex:

  • Real-time registration of the main technological parameters of well repair processes, data transfer in pseudo-real-time mode (1 time in 5 minutes), information processing and accumulation for subsequent analysis.
  • Display of the registered parameters on a driller's board.
  • Video surveillance of the wellhead.
  • Monitoring the status and operation of the equipment of a mobile drilling rig for the prompt adoption of measures to eliminate the malfunction.

OAO Nizhnevartovskneftegeofizika

地点: Moscow / Nizhnevartovsk
主要产品/服务: Full range of geophysical services