Product / Equipment

Reception Bridges on the Chassis with racks

(设备/材料)
型号编号: МПШ
状态: New
位置或存放国家: Russia
位置: Russia / Bashkortostan / Ishimbay
服务工程支持: Yes
保证: No
价钱: 要求价格
描述:
Reception and laying of tubing and drill pipe is an operation that can be greatly simplified when receiving bridges on the chassis with racks are used in the working cycle. The carrying capacity of racks can reach one hundred tons, depending on the type of chassis used in the design of the receiving bridges. In order to ensure the safe operation of the bridge, the receiving bridges on the chassis with racks are made in accordance with the rules of BNiGP. A two-axle or three-axle trailer with special equipment on board can act as a chassis. As such, in particular, trailers of models 857257, 857258, 857259, etc. can act. Their transportation between the serviced objects is carried out by T-150K, K-700 tractors, other special equipment and trucks, the design of which involves the presence of a towing mechanism corresponding to GOST 2349-75, as well as electrical and pneumatic terminals that meet the standards 4364-81 and 9200 -76.
概观:

The receiving bridges on the chassis with racks have a weight of up to 6.3 tons with a carrying capacity of at least 40 tons. When deployed on site, the length of the system, compared to a similar size in the transport position, is approximately doubled. The design of the bridges provides the possibility of rapid deployment and dismantling of equipment at the wellhead without the use of additional lifts and other mechanical devices for transporting goods.

LLC "Uralneftemashkomplekt"

地点: Russia / Bashkortostan / Ishimbay
主要产品/服务: Drilling rigs and units for well repair
注册: Russia / Bashkortostan / Ishimbay