×
名字和姓氏
有效的电子邮件地址。 该地址将用于系统电子邮件和通知。
使用条款
Show terms

By accessing and utilizing our servers, services, websites, or any associated content/postings, you agree (individually and on behalf of a business if applicable) to our Terms of Use (below), which we may update anytime at our discretion. If you do not agree to the Terms of Use (“Terms”), then you are not authorized to use any of our materials for either posting or viewing/search purposes.

More info

9 + 4 =
解答这道简单的数学问题并输入结果。 例如。 对于1 + 3,请输入4。
这个问题被要求找出是否你是一个人或自动发送同样的消息到多个新闻组邮件列表。
Product / Equipment

Mobile Drilling Complex MBU - 125

(设备/材料)
型号编号: МБУ - 125
状态: New
在制作: Kazakhstan
位置或存放国家: Kazakhstan
位置: Kazakhstan / Petropavlovsk
服务工程支持: Yes
保证: No
价钱: 要求价格
描述:
Purpose: drilling of exploration and production wells, workover operations, including for sidetracking in existing wells and other types of well construction.
概观:

The drilling rig consists of separate blocks mounted on semi-trailers that are transported using universal tractors, which ensures its mobility and significantly reduces the time it takes to travel from well to well.
The service life of failure-free operation is ensured through the use of a power engine Caterpillar C-15, C-18, transmission - Allison HD 47000FS and pneumatic clutches for engaging drives of the company "WPT";
The unit's hydraulic system is driven from an additional power take-off box, which allows mounting and dismantling at the well without connecting electricity and unloading the drive during round-trip operations;
The fastening of the wind guards of the mast is carried out on the consoles of the transverse beam of the rotary base, which does not require the installation of anchors and increases mobility.
The presence of force dynamometers on the guy wires.
The presence of two pneumatic lines (the main one from the lift compressor, the auxiliary one from the compressor block) ensures their duplication and an increase in air supply, if necessary.
The ability to adjust the parameters of the mud pumps from the driller's platform.
The extension of the upper section of the tower is carried out using a drawworks, both from the main and from the emergency drive.
The presence of a rotor brake pneumatically controlled from the driller's control panel.
An original system for connecting detachable elements using special pins without using threaded connections, which reduces the time for assembly and disassembly of blocks.
Multi-module power unit, which houses:
- transformer module;
- module for controlling the parameters of the complex;
- module of diesel generator and compressor block.
The system for monitoring drilling parameters with archiving allows you to monitor the correctness of the progress of drilling and tripping operations.
It is possible to display the drilling parameters on the drilling foreman's PC in real time with their recording, in addition, there is a non-volatile unit with the recording of the main parameters (pressure in the supply manifold and weight on the hook).

Specifications

Lifting installation

Rated hook load KN (t) 1250 (125)
Mounting base - chassis self-propelled off-road platform
Diesel engine "Caterpillar with spark arrester" (kW) 448
Conditional drilling depth, m (drill pipes, weight 30 kg / m) 2500
Hook lifting speed, m / s from the main drive 0..1.59
Drill plug length, m 18 - 20
Tower - two-section, telescopic with an open front edge.
Tower height, m 36

Petropavlovsk Heavy Machine Building Plant

地点: Kazakhstan / Petropavlovsk
主要产品/服务: Manufacturing of equipment for oil and gas production, oil and gas processing, petrochemical, chemical, gas, energy and other industries
注册: Kazakhstan / Petropavlovsk