×
名字和姓氏
有效的电子邮件地址。 该地址将用于系统电子邮件和通知。
使用条款
Show terms

By accessing and utilizing our servers, services, websites, or any associated content/postings, you agree (individually and on behalf of a business if applicable) to our Terms of Use (below), which we may update anytime at our discretion. If you do not agree to the Terms of Use (“Terms”), then you are not authorized to use any of our materials for either posting or viewing/search purposes.

More info

7 + 12 =
解答这道简单的数学问题并输入结果。 例如。 对于1 + 3,请输入4。
这个问题被要求找出是否你是一个人或自动发送同样的消息到多个新闻组邮件列表。
添加产品
Product / Equipment

Gas Turbine power unit of the Ural-2500 Hydroelectric power Station

(设备/材料)
型号编号: Урал-2500
状态: New
位置或存放国家: Russia
服务工程支持: Yes
保证: Yes
价钱: 要求价格
描述:
The power unit is based on the GTU-2.5P with a nominal capacity of 2.5 MW, developed on the basis of the gas generator of the most reliable engine in the history of the domestic aviation industry, the D-30, created for mainline passenger aircraft such as the Tu-134. It is used to produce electrical and thermal energy. It operates as the main and backup power source; in the basic, semi-peak and peak use classes, autonomously and in parallel with other sources of electrical energy and power systems.
概观:
Nominal power at generator terminals 2.6 MW
Nominal frequency of electric current 50 Hz
Gas temperature behind the power turbine at the exhaust 361 °C
Gas flow behind the power turbine at the exhaust 25.6 kg/s
Thermal power according to the utilization scheme 5.8 Gcal/h
Fuel heat utilization coefficient at t out = 110 °C 76.9%
Fuel gas parameters before the gas turbine power plant: pressure (excess) 10...12 kgf/cm2
Fuel gas parameters before the gas turbine power plant: temperature range +5...+90 °С
Equivalent sound level during maintenance no more than 80 dBA
Resource before major repairs 30000 h
Resource assigned 120000 h

JSC "UDK"

地点: Yaroslavl region, Rybinsk, Tolbukhina st., 16
主要产品/服务: Power equipment