×
名字和姓氏
有效的电子邮件地址。 该地址将用于系统电子邮件和通知。
使用条款
Show terms

By accessing and utilizing our servers, services, websites, or any associated content/postings, you agree (individually and on behalf of a business if applicable) to our Terms of Use (below), which we may update anytime at our discretion. If you do not agree to the Terms of Use (“Terms”), then you are not authorized to use any of our materials for either posting or viewing/search purposes.

More info

解答这道简单的数学问题并输入结果。 例如。 对于1 + 3,请输入4。
这个问题被要求找出是否你是一个人或自动发送同样的消息到多个新闻组邮件列表。
添加产品
Product / Equipment

Cementing pump NC 320

(设备/材料)
状态: New
位置或存放国家: Russia
服务工程支持: Yes
保证: Yes
价钱: 要求价格
描述:
The NC 320 pump is a horizontal, double-piston, double-acting pump with a built-in worm gear and increased load capacity. The NC 320 is used for pumping liquids (clay, cement, and brine solutions) during flushing, flushing, and cementing operations in oil and gas wells during drilling and workover.
概观:

Technical characteristics of the NC 320 cementing pump

Useful power, kW 108
Number of double piston strokes per minute from 30 to 133

Diameter of replaceable bushings, mm

90, 100, 115, 127
Piston stroke length, mm 250
Worm gear ratio 22
Pipe diameter, mm: suction - 100

injection - 50

Overall dimensions, mm, no more than: length - 2385
width - 750

height - 2390

Weight, kg no more than 2890

Operating mode of the NC 320 pump

Number of double piston strokes per minute Diameter of cylinder liners, mm Volumetric flow, l/s (m3/h) Maximum pressure, MPa (kgf/cm2)
133 90 12.3 (44.3) 9.5 (95)
100 15.6 (56.2) 7.5 (75)
115 21.2 (76.3) 5.5 (55)
127 26.0 (93.6) 4.5 (45)
30 90 2.8(10.1) 40.0 (400) *
100 3.5(12.6) 32.0 (320) *
115 4.8(17.3) 23.0 (230) *
127 6.0(21.6) 18.5(185)*

Notes:
1. Permissible deviation of volumetric feed is minus 20%.
2. * Pressures (highest) are limited by a safety valve
3. It is not recommended to operate the pump for long periods with the number of double strokes exceeding 70.

The NC 320 design is based on the 9T pump, incorporating a worm gear, a solid-forged disc, and other design and technological improvements that increase durability and reliability. An undeniable advantage of this "continuity" is that the main components and assemblies of the NC 320 are compatible with those of the previously produced 9T.

Pressure and volumetric flow of the NC 320 pump depending on the diameter of the sleeve and the number of double piston strokes

Number of double piston strokes, strokes/min Diameter of replaceable bushings, mm Ideal flow, dm3/s (m3/h) Maximum pressure, MPa
133 90 12.3 (44.3) 9.5
100 15.6 (56.2) 7.5
115 21.2 (76.3) 5.5
127 26.0 (93.6) 4.5
30 90 2.8 (10.1) 40.0
100 3.5 (12.6) 32.0
115 4.8 (17.3) 23.0
127 6.0 (21.6) 18.5


The NC-320 pump is a logical continuation and improved version of the 9T pump. Since these units are built on the same principle and even differ little in appearance, they share the same scope of application.

The primary function of cementing pumps is to deliver various specialized compounds into the well during cementing operations. They are also used for other well operations, such as repair and maintenance.

The pump is structurally quite universal, so it can be used in other areas where such characteristics are required.

Equipment

The NC-320 pump, like its predecessor the 9T, is a horizontal pump consisting of two functional units:

  • Hydraulic block: This is where the pressure required to pump liquids is created, and this is where these liquids pass through the pump body.
  • Drive unit: This is the mechanical part that is responsible for the movement of the entire system.

Unlike its predecessor, the NC-320 received a worm gear in the drive section, a solid stamped plate, and a number of small but important design changes and improvements aimed at increasing the strength and reliability of the mechanism.

Otherwise, it is the same 9T, which has already proven its efficiency, reliability and performance.

Service

The NC-320 pump is relatively simple in design. Therefore, it doesn't require extensive maintenance, repair, or inspection.

The frequency of repairs and replacement of parts will depend on the intensity of its use.

The unit must be regularly inspected for obvious external and internal damage, natural wear of moving parts, and oil contamination. Under normal operation, the oil should be replaced at least once every six months. This is typically done during seasonal changes to select a more suitable brand for the changing temperature conditions.

LLC "IMZ" (Limited Liability Company "Izhevsk Machine Plant")

市场: ОАО «Сарапульский Машиностроительный завод», ОАО ТД «Воткинский завод», ТД «Волгабурмаш», ЗАО «Техновек», ОАО «Ижнефтемаш»
地点: 426000, Russia, Udmurt Republic, g. Izhevsk, st. Krasnoarmeyskaya, 1B
主要产品/服务: Drilling pumps (NB 125, NB 80, NB 50, NB 32, 9T, NC 320), ball valves, 3KSh swivel elbow, CA-320 manifold pipe, quick coupling, tubing tee, KM plug valve, drill bits, elevators, crowns, swivels, metal structures
注册: 426008, Russia, Udmurt Republic, Izhevsk, Pushkinskaya street, house No 257, office
成立年: 2002