添加产品
Product / Equipment

Mobile drilling complex MBK-140

(设备/材料)
型号编号: МБК-140
状态: New
位置或存放国家: Russia
位置: Russia Moscow
服务工程支持: No
保证: No
价钱: 要求价格
描述:
Designed for drilling production and exploratory wells, overhaul of wells and sidetracking. The depth of drilling is up to 3000 meters (when drilling a column of 28 kg / m).
概观:

MBK-140 installation provides the following works:

  • installation - dismantling of equipment at the wellhead;
  • hoisting operations;
  • moving from well to well;
  • descent of tubing, drill pipe and casing;
  • installation of production equipment at the wellhead;
  • emergency response work;
  • drilling cement plugs and related operations (lowering and raising drill pipes, flushing wells, etc.);
  • cementation of bridges, etc.
  • milling and liquidation of wells;
  • drilling operations;
  • sidetracking.

The mobile drilling complex is designed to operate in macroclimatic regions with a temperate and cold climate at an ambient temperature of -45 ° С to + 45 ° С. Accommodation category I according to GOST 15150.

The advantages of MBK-140 in comparison
with domestic production facilities:

1. The installation simplified the transmission of the winch drive, rotor and emergency drive:
1.1. The number of gearboxes - 3 instead of 5;
1.2. The number of chain circuits - 3 instead of 5;
1.3. There is no emergency drive gearbox and associated circuit;
1.4. The emergency drive system employs 1 (one) gerotor hydraulic motor mounted in an intermediate gearbox having only 4 gears, which ensures the operation of all systems of the mobile drilling complex;
1.5. The emergency system is able to maintain the performance of the complex with hook loads of up to 140 tons.
1.6. The kinematic scheme of the intermediate gearbox is completely unloaded from the efforts of the winch to drive gears;
2. Three chain circuits of the winch are located in the oil baths of the winch body and occupy a smaller size.
3. The installation used a new kinematic diagram of the brake system of the winch, which provides an insignificant elevation angle of the brake handle when disengaging and a small force when braking the maximum load, due to the presence of a gear transmission with a variable gear ratio;
an automatic device was introduced to protect the driller from being hit by the brake handle during emergency operation of the air brake; a pneumatic brake cylinder was introduced instead of automobile pneumatic chambers and chambers with an energy accumulator having an insufficient stroke and a small force on the rod.
4. Also, a powerful two-section cylinder for extending the upper section of the tower with two rods pointing up and down was introduced in the installation, the length of each is equal to half the stroke of a single-section cylinder. This makes it possible to exclude folding centralizers, which are extremely unreliable elements, from the design of the installation.
5. An automatic pressure relief valve has been introduced in the hydraulic system for lifting the tower, which allows overloading the rear tower support and struts at the end of the tower lifting and in preparation for the descent.
6. In the mobile drilling base of the installation, instead of removable side struts, struts with a double hinge are introduced, allowing them to be laid in the corresponding grooves of the mobile base during transportation.
7. A longitudinal opening is made in the upper frame of the mobile drilling base, allowing the chute to be brought closer to the rotor, which provides the convenience of gripping and releasing single pipes when moving them to and from bridges.

Specifications:

Main technical characteristics of the MBK-140 mobile drilling complex
Parameter name, characteristics Parameter value, characteristics
Lifting block
Permissible load on the hook, no more than kN (tf) 1374 (140)
Mounting base MZKT-7003
Drive power, kW (hp) 330 (450)
Power of emergency electric drive, kW 37
Tower
Type of inclined, telescopic with open front face
The angle of inclination at a distance from the axis of the hook block to the axis of the rear outriggers 2280 ± 20 mm 3º 30 ´ ± 5´
Number of sections 2
Height from the ground to the crown block axis, m 38
Length of the lifted candle, m, no more 24
Capacity of riding shops of horse riding workers:
1) drill pipes Ø 114 and 127 mm, linear length, m 3000
2) tubing and drill pipes Ø 73 and 89 mm, linear length, m 5500
Tackle system
Rigging 4 x 5
Diameter of the hoist rope, mm 28
The lowest hook block lifting speed, m / s, no more 0.015
The highest hook block lifting speed, m / s, not less 1.4
Winch
Bollard pull, kN (tf), not less 191 (19.5)
Active area of brake bands, m2 1.3
Pulley Coverage 330º
Clutch disc, friction, pneumatic
Effort on the brake lever, N (kgf), no more 200 (20)
Auxiliary hydraulic winch 1 PC.
Nominal load on the hook, kN (tf) 29.1 (3)
Permissible short-term, kN (tf) no more 49.2 (5)
Pressure in a hydraulic system, MPa (kgf / cm2), no more 20 (200)
The highest hook lifting speed, m / s, no more 0.3
Idle pressure, MPa (kgf / cm2), no more 1.5 (15)
Hydraulic brake
Inclusion operational, disc pneumatic clutch
The braking moment on the shaft of the winch drum at a lowering speed of the column of 0.5 m / s, kNm (tsm), not less 24.5 (2.5)
The steady speed of descent of the hook block with a mass of 84 tons, m / s, no more 0.5
Thread Release 2 pcs, right left hydraulic tool
Maximum traction effort, no more than kN (hardware) 49 (5.0)
Working fluid pressure, MPa (kgf / cm2), no more 20 (200)
Stroke, mm 900 ± 20
Mounting hydraulic system
Maximum pressure, no more than MPa (kgf / cm2) 15.7 (160)
Four-section tower lifting hydraulic cylinder
Stroke mm 3970 ± 20
Working fluid pressure, MPa (kgf / cm2), no more 17.6 (180)
Length in compressed state, mm 1745 ± 20
Extension cylinder for the upper section of the tower
Length in compressed state, mm 14713 ± 20
Stroke mm 14000 ± 20
Working fluid pressure, MPa (kgf / cm2), no more 15.7 (160)
Outriggers
Stroke mm 800 ± 10
Working fluid pressure, MPa (kgf / cm2), no more 15.7 (160)
Hydraulic drive of working bodies
Number of hydraulic pumps 2
Maximum performance of hydraulic pumps (total), m3 / s (l / min) 0.0063 (380)
Maximum pressure in the drive line of hydraulic breakers and auxiliary winch, MPa (kgf / cm2), no more 20 (200)
Maximum pressure in the drive line of the hydraulic rotor (hydraulic key), MPa (kgf / cm2), no more 20 (200)
Pneumatic drive of working mechanisms
Working pressure, MPa (kgf / cm2) 0.6-0.8 (6-8)
Main compressor
Emergency compressor
chassis
KV-7
Hook block lift limiter
Type of cable system
Run, m, no more 2.0
Minimum distance to crown block, m one
Device for insurance
Device type Sliding, self-clamping guy line by the stairs
Permissible load, N (kgf), no more 1470 (150)
Horse emergency evacuation device
Device type self-braking, with forced disinhibition, evacuation by special guy
Permissible load, N (kgf), no more 1470 (150)
Load Limiter IVE-50
Load Limit Accuracy ± 2.5%
Emergency and main tower lighting
Voltage 24
Number of explosion-proof fixtures 10
Emergency engine shutdown
Break type electro-magnetic air gate valve; inclusion from a driller post
the duration of the engine after turning on the stop, s, no more 10
Manifold riser with media separator and articulated knee and drill sleeve 76x20x18000
Working pressure in the line, MPa no more 35
Conditional pass, mm 76
Mounting dimensions BRS 3 "
Retraction in the line of the manifold sleeve 76x20x4000 mm
Emergency drive Electric motor and gerotor hydraulic motor
Overall dimensions in transport position, m, no more 23 x 3.2 x 4.5 (without balcony)
Weight in transport position, kg, no more 66000
Optional equipment
Universal rotary drill rotor
a) diameter of the bore of the rotor table, mm
b) permissible load on the rotor table and wedge grip, kN (tf), no more
d) maximum torque, kN-m
d) maximum speed, s-1 (rpm)
f) diameters of pipes captured by wedge suspension, mm *
g) wedge lift drive
h) overall dimensions, mm, no more
i) weight, kg, no more

560
1226 (125)
25
2.5 (150)
60, 73, 89, 102, 114, 127, 140, 146, 168, 178, 194, 219, 245, 273, 299, 324, 340
double-acting pneumatic cylinder
1900 x 1000 x 900
2700
Swivel VB-140
a) permissible static load, kN (tf), no more
b) permissible dynamic load with a maximum speed of 6 s-1 (360 rpm), kN (tf), not more than
c) bore diameter, mm
d) rotation frequency, not more than, s -1 (rpm)
d) the nominal pressure of the washing fluid MPa (kgf / cm2)
e) overall dimensions, mm, no more
g) mass, kg, no more

1373 (140)
981 (100)
75
6 (360)
19.6 (200)
2400 x 670 x 662
750
Set of slings
a) permissible load on the complete pair, kN (tf), no more
b) length, mm

1337 (140)
1800
Indicator weight IVE and DEL
Parameter control:
a) weight on the hook,
b) the moment on the rotor
electronic
Drill Base Block
a) the maximum distance from the ground to the bottom of the rotor beams, m
b) permissible static load on the candlestick, kN (tf), no more
c) permissible load on the rotor beams, kN (tf), not more than
g) overall dimensions in the expanded (working) position, m, no more
d) overall dimensions in transport position, m, no more
e) total weight, kg, not more than


5.2 + 0.1
981 (100)
1337 (140)
11.0 x 5.1 x 8.1
11.0 x 2.8 x 3.5
22000
Mobile receiving bridges
a) transport base
b) the allowed total uniformly distributed mass of pipes on the shelves, not more than
c) overall dimensions in working position, m, no more
d) overall dimensions in transport position, m, no more
d) weight, kg, no more

three-axle trailer OZTP
140
13.23 x 10.5 x 1.8
13.23 x 3.2 x 1.8
9000
Prefabricated ramp
a) length, mm, no more
b) height, mm
c) mass, kg

16000
300
7000

* - at the choice of the customer.

The complete set can be supplemented at the request of the customer with additional accessories, tools and accessories (elevators, keys, power plants, etc.)

Completeness:

Name Quantity for installation, pcs.
Lifting block one
Drill Base Block one
Mobile receiving bridges one
Rotor (mechanical drive *, hydraulic drive *) with wedge suspension and a set of clamps for pipes * 60, 73, 89, 102, 114, 127, 146. one
Swivel VB-140 one
Set of ShBD-140 slings (ShBD-200 is allowed), L = 1800 mm. one
WBT pipe * one
Ramp one
Electronic weight indicator IVE or DEL one
Sleeve of drilling 76х20х18000 one
Set of spare parts, tools and accessories one
Set of accompanying documentation one

BOEZ Group of Companies

员工总数: 11
地点: Russia Moscow
主要产品/服务: Production of mobile drilling rigs
注册: Russia Moscow